Skip to content

New projects

Reinforced Concrete Design

Foundations, columns, beams, slabs and shear walls designed as one load path — detailed for the field and issued permit-ready.

Applies to
New construction
Coverage
Miami-Dade & Broward County, Florida

When you need it

Concrete has to be right on paper first.

Concrete is unforgiving: reinforcement that cannot be placed, a transfer condition resolved late, or a slab thickness set before the loads are known all become field problems that cost far more than they saved.

  • 01You are building a house, townhouses, a mid-rise or a commercial frame and need the structural set for permit.
  • 02An architect has a design and needs the structure engineered behind it.
  • 03A contractor needs buildable reinforcement details, not a schematic.

Developers and building owners · Architects carrying a project through permitting · General contractors and concrete subcontractors

Scope & deliverables

What's included

  1. Gravity system — slabs, beams, girders, columns
  2. Lateral system — shear walls, frames, diaphragms
  3. Foundations — spread footings, mats, grade beams, pile caps
  4. Transfer conditions, openings and irregular framing
  5. Reinforcement design, development and splice detailing
  6. Construction-phase RFIs and submittal review

What you receive

  1. Structural drawing set, permit-ready
  2. Structural calculations package
  3. General notes and typical details
  4. Signed and sealed documents where the scope requires it

Next step

Send the architectural drawings (any stage) and the site location. You receive a proposal with scope, deliverables and fee.

How the work runs

01

Load take-down

Occupancy, dead, live and hurricane-wind loads established for the actual site before any member is sized.

02

System selection

Framing layout, slab type and lateral strategy chosen with the architect — span, depth and cost tested together.

03

Analysis & sizing

Members analyzed and designed to the Florida Building Code, with deflection and serviceability checked.

04

Detailing

Reinforcement drawn so it can actually be placed — congestion, cover, hooks and splices resolved on the drawing.

05

Check & seal

Drawings checked line by line against the calculations, then signed and sealed for permit submittal.

Good to know

What changes the scope — and what no engineer can promise.

  • Foundation design depends on a geotechnical report; where none exists we will tell you what is needed before we start.
  • Scope and fee change with irregularity — transfers, cantilevers, post-tensioning and unusual geometry are priced honestly, not absorbed silently.
  • Permit review comments are part of the process; we respond to them, but no engineer can guarantee a jurisdiction’s decision.

Next step

Tell us about the building. We reply with a scope.

A county notice in your hand, a building that worries you or a new project — describe it and attach what you have. A phone photo of the letter is enough. You hear back from the engineer, with questions or with a written proposal.

Miami-Dade & Broward County, Florida