Skip to content

Services

Organized by what you need, not by what we do.

Eight services in two tracks. If you own or manage a building that is already standing, start with existing buildings. If you are building something, start with new projects. Each service says when you need it, what is included, what you receive and what to do next.

Existing buildings
4 services
New projects
4 services
Coverage
Miami-Dade & Broward

Existing buildings

You own or manage a building.

For associations, property managers and owners with a county notice, a deadline, visible distress or a repair to scope. Miami-Dade and Broward each run their own program, and each has its own page here.

01Existing buildings

Miami-Dade Building Recertification

A clear path from the Miami-Dade notice to a closed recertification — inspection, the structural report on the county’s form, repair scope, reinspection.

When you need it
A Notice of Required Inspection has arrived from your city or from Miami-Dade County — or a courtesy notice says one is on its way.
What's included
Notice review · Structural inspection · Report on the county’s form · Repair scope · Reinspection
What you receive
Structural recertification report on the county’s own form, signed and sealed
Next step
Send the notice — a phone photo is enough — or the address and the year built. We confirm what your Building Official is asking for and reply with a proposal for the inspection and the structural report.
See This Service: Miami-Dade Building Recertification

02Existing buildings

Broward Building Safety Inspection Program (BSIP)

From the Notice of Required Inspection to the completion letter that closes the file — inspection, the structural report on the program’s official form, repair scope, reinspection.

When you need it
A Notice of Required Inspection has arrived from your city’s Building Official — or the building is nearing the age at which one will.
What's included
Notice review · Structural inspection · Report on the official form · Repair scope · Reinspection & close-out
What you receive
Structural report on the program’s official form, with a written narrative and color photographs, signed and sealed
Next step
Send the notice — a phone photo is enough — or the address and the year of the certificate of occupancy. We read what your city is asking for and reply with a proposal for the inspection and the structural report.
See This Service: Broward Building Safety Inspection Program (BSIP)

03Existing buildings

Milestone & Structural Safety Inspections

Florida’s milestone inspection explained for your building, further investigation when a report calls for it, and structural safety inspections outside a program cycle.

When you need it
Your board needs to know whether Florida’s milestone law reaches the building, and how it is met in your county.
What's included
Applicability review · Structural inspection · Further investigation · Prioritized findings
What you receive
Inspection report with photographic record
Next step
Tell us the building’s county, age and number of stories, and what raised the question — a notice, a report, a sale. We reply with which rules apply and a proposal for the inspection.
See This Service: Milestone & Structural Safety Inspections

04Existing buildings

Structural Assessments & Repair Design

What the building is actually doing today — deterioration assessed, capacity evaluated, repairs engineered so they can be bid and built.

When you need it
A recertification, BSIP or inspection report lists repairs and the contractors’ bids are not comparable because nobody defined the scope.
What's included
Field assessment · Deterioration mapping · Capacity evaluation · Repair specification
What you receive
Condition assessment report
Next step
Send photographs of the conditions and any previous report. We tell you whether a site visit is needed and what the assessment will cover.
See This Service: Structural Assessments & Repair Design

New projects

You are building something.

For owners, developers, architects and contractors with a project in design or heading to permit.

05New projects

Reinforced Concrete Design

Foundations, columns, beams, slabs and shear walls designed as one load path — detailed for the field and issued permit-ready.

When you need it
You are building a house, townhouses, a mid-rise or a commercial frame and need the structural set for permit.
What's included
Foundations · Columns & beams · Slabs · Shear walls · Reinforcement detailing
What you receive
Structural drawing set, permit-ready
Next step
Send the architectural drawings (any stage) and the site location. You receive a proposal with scope, deliverables and fee.
See This Service: Reinforced Concrete Design

06New projects

Structural Analysis & Foundations

Gravity and lateral analysis, wind and seismic demand, and the foundation system that carries all of it into the ground.

When you need it
You need to know whether a site, a soil report or a building concept works structurally before committing.
What's included
3D modeling · Wind & seismic demand · Drift control · Deep foundations · Settlement checks
What you receive
Analysis model and results summary
Next step
Share the site, the geotechnical report if you have one, and the building concept. We reply with what is feasible and what the analysis will cost.
See This Service: Structural Analysis & Foundations

07New projects

BIM Modeling & Coordination

Coordinated digital models that resolve conflicts before they reach the field and produce clearer structural deliverables.

When you need it
The project team works in Revit and needs the structure modeled to the same standard.
What's included
Structural modeling · Model federation · Clash detection · Issue tracking · Model-derived drawings
What you receive
Structural model at the agreed level of information
Next step
Tell us the software the team uses, the level of detail required and the coordination schedule. We propose the modeling scope and the exchange format.
See This Service: BIM Modeling & Coordination

08New projects

Peer Review & Compliance

An independent second read of the structural design — code compliance, load path, constructability and documentation quality.

When you need it
A lender, insurer or owner requires an independent structural review before construction.
What's included
Drawing review · Calculation check · Load-path continuity · Constructability · Comment log
What you receive
Independent review report
Next step
Send the drawing set and calculations, and say what the review is for. You receive a fixed-fee proposal for the depth of review that matches it.
See This Service: Peer Review & Compliance

How we work

Five steps. You always know which one you are on.

The sequence is the same whether you are answering a county notice or permitting a new frame. What changes is the depth of step three.

01

Initial consultation

Your part Send the notice, or describe the building or the project, and share what you have — photos, drawings, prior reports.

You get A direct conversation with the engineer and a first read on what is needed.

02

Scope & proposal

Your part Review a written proposal that states scope, deliverables, exclusions and fee.

You get A document you can compare, question and approve. Nothing starts before it is agreed.

03

Evaluation or design

Your part Give access to the site, or answer the architect’s coordination questions as they come.

You get Inspection and findings for existing buildings; analysis, modeling and detailing for new ones — with questions raised as they come up, not saved for the end.

04

Delivery

Your part Review the report or the signed and sealed drawing set, and ask about anything that is unclear.

You get Documents written to be acted on: a board can read the findings, a contractor can build the details, a reviewer can follow the reasoning.

05

Follow-up

Your part Forward the reviewer’s comments, the contractor’s RFIs or the reinspection request.

You get Answers from the engineer who did the work — through permit comments, construction questions and, for existing buildings, reinspection and close-out.

Next step

Tell us about the building. We reply with a scope.

A county notice in your hand, a building that worries you or a new project — describe it and attach what you have. A phone photo of the letter is enough. You hear back from the engineer, with questions or with a written proposal.

Miami-Dade & Broward County, Florida